For around five years, we have looked after the cranes and lifting equipment at a local foundry. It’s an industrious environment and the equipment runs around the clock, six days a week, which is why the site operates a bi-weekly examination scheme and why we have a single day each week in which to carry out inspections and any repairs that come out of them
While carrying out the LOLER examination on a 10-tonne overhead travelling crane, in fact a 20-tonne machine downrated to cope with the intensity of the workload, one of our engineers found that one of the long travel rails had developed a crack running across it. The same defect had gone on to damage one of the long travel wheels that runs along that rail, so both needed urgent attention.