Our engineer arrived on site on a beautiful summer morning, signed in and completed all required site inductions, toolbox talks and safety procedures before being directed to the lift shaft.
Working to a method agreed in advance with the principal contractor, he installed concrete anchor points into the lift shaft pit floor to provide the secure reaction points needed to apply the test loads. Calibrated load-measuring equipment was then connected to each beam using suitable lifting slings and a lever hoist. The load was applied gradually and under control, allowing him to monitor and accurately record both the forces imposed on each beam and the deflection of each beam throughout the test.
Both beams were successfully tested to their required loads. Each was then marked with its own unique identification number and confirmed working load limit, giving the site clear identification and traceability for the life of the equipment.