A longstanding client asked us to quote for the supply and installation of 175 bays of industrial racking at one of their facilities on the Isle of Wight. The racking was for storing light goods only, and it all had to be built and positioned on a mezzanine floor to suit how the customer wanted the space to work.
That last point shaped the whole job. We had to get every component up to the mezzanine before we could assemble a single bay, and 175 bays is a substantial amount of material to move. We had to plan the delivery logistics and access into the work area well before anyone picked up a tool.