If your business lifts anything at work, from a pallet on a forklift to a patient in a hoist, the Lifting Operations and Lifting Equipment Regulations 1998 apply to you. Most people know LOLER as the reason an engineer turns up every six or twelve months, but the regulations ask for a good deal more than a date in the diary.
We carry out LOLER inspections across the UK, and the same questions come up on nearly every site we visit. This guide answers them in plain terms and explains where LOLER stops, and PUWER inspections take over.
What The LOLER Regulations Require
LOLER sits under the Health and Safety at Work etc. Act 1974 and has been in force since December 1998. In simple terms, it asks three things of anyone responsible for lifting at work.
- Suitable equipment: lifting equipment has to be strong and stable enough for the job, positioned and installed to keep risk down, and clearly marked with its safe working load.
- Planned lifts: every lifting operation must be planned by a competent person, properly supervised and carried out safely.
- Thorough examination: equipment must be examined by a competent person at set intervals, with a written report each time.
Equipment that lifts people carries extra duties on top, including safeguards that stop the carrier from falling.
Who Is Responsible For LOLER Compliance
The duty falls on employers, the self-employed, and anyone who controls lifting equipment used at work. That last group is wider than people expect and includes facilities managers and building owners who look after a lift used by other people’s staff.
Hiring equipment in doesn’t hand the responsibility back to the supplier either. The hire company has to provide evidence of the last thorough examination when the equipment arrives, but keeping it examined when it falls due, and using it safely in the meantime, sits with whoever has it on site.

What Counts As Lifting Equipment Under LOLER
LOLER covers any equipment used at work to lift or lower a load, along with the accessories that attach the load to it. A typical site inspection includes:
- Overhead cranes, gantries and swing jibs
- Hoists, chain blocks and lever hoists
- Forklift trucks, vehicle tail lifts and MEWPs
- Passenger and goods lifts in the workplace
- Patient hoists in care homes and hospitals
- Slings, shackles, eyebolts and other lifting accessories
The accessories are the part that gets forgotten. A crane can be fully up to date while the chain slings and shackles hanging from its hook haven’t been checked for years, and the law requires those accessories to be examined every six months.
There are a few exceptions worth knowing. Escalators and moving walkways come under the Workplace Regulations rather than LOLER, and equipment that isn’t used at work, such as a stairlift in a private home, falls outside it altogether.
How Often LOLER Thorough Examinations Are Needed
The regulations set the maximum time allowed between thorough examinations.
- Every six months: equipment used to lift people, and all lifting accessories
- Every twelve months: all other lifting equipment
A competent person can replace those fixed intervals with an examination scheme, which sets the frequency around how hard the equipment works and the conditions it works in. A crane running all day in a steel stockholder lives a very different life to one lifting a few loads a week in a clean workshop.
An examination is also required before first use, after installation or assembly at a new location, and after anything that could affect safety, such as an overload, impact damage or a major repair. Where the examiner needs to prove the equipment can carry its rated load, it’s tested as well, which we handle on site or on our own rigs through our proof load testing service.
What Happens When An Examination Finds A Defect
Every thorough examination ends with a written report, and any defect found is recorded on it. If the defect poses an existing or imminent risk of serious injury, the competent person has to tell the duty holder straight away and send a copy of the report to the enforcing authority, which is the HSE for most workplaces. The equipment can’t be used again until the fault is put right.
Less serious defects come with a date by which they must be fixed, and this is where compliance slips. The report goes into a file, the date passes, and the next examination finds the same fault still there. A full set of certificates with a list of unactioned defects attached is not the strong position it looks like.

Keeping LOLER Records That Stand Up
The law expects you to keep every report and produce it when the HSE or your insurer asks to see it. The report from the first examination after installation stays on file for as long as the equipment is in use, while later reports are kept until the next one is issued or for two years, whichever is later.
Paper certificates in a filing cabinet are where gaps appear, so we enter every report we issue into CheckedOK, our online certificate portal. Each item carries its history, open defects and next due date, so an HSE visit or insurer’s audit becomes a quick look rather than an afternoon of searching.
LOLER On Ships & Vessels
Lifting equipment aboard ships has its own version of the rules in the Merchant Shipping and Fishing Vessels (Lifting Operations and Lifting Equipment) Regulations 2006. They follow LOLER 1998 closely and apply to UK-registered ships and to other vessels operating in UK waters. Our Marine LOLER inspections cover the full inventory, alongside or during a refit.
How LOLER & PUWER Work Together
PUWER, the Provision and Use of Work Equipment Regulations 1998, covers all work equipment, lifting equipment included, so a crane has to satisfy both. LOLER governs the lifting and the thorough examination, while PUWER covers maintenance, controls, guarding and training. We inspect against both on the same visit.
If you’re not sure when your equipment was last examined, or whether the slings and shackles were included last time, that’s the place to start. Our engineers can examine everything you lift with, on your site or at our facility, and our CPD accredited lifting and crane training gives your operators the knowledge to carry out pre-use checks between visits.