Proof Load Testing

800-Tonne Capacity, On-Site Or In Our Test Facility

Whether you need a single shackle certified or an overhead crane proof tested to 100 tonnes, we provide accurate, traceable load testing on-site or in our workshops, backed by certification accepted across every regulated industry.

Trusted By Industry Leaders
BAE Systems
QinetiQ
Sunseeker
Emirates
Disney Cruise Line
Holcim UK
Freightliner
ABP (Associated British Ports)
Prysmian
Serco
Biffa
Wärtsilä
Qatar Airways
Southampton FC
Tottenham Hotspur FC
EDF Energy

On-Site & In-House Proof Load Testing

Accurate, Traceable & Accepted Across Every Regulated Industry

Proof load testing is the difference between equipment that’s rated for a load and equipment that’s proven to handle one. We deliver that proof for lifting operators across the United Kingdom, applying calibrated loads to your cranes, accessories, and structures using methods chosen to suit the equipment, the environment, and the standard you need to meet.

Whether tested on your premises or in our purpose-built test facility, every result is fully documented and traceable to national standards. Certificates are issued through our digital portal (CheckedOK), giving you instant access to your equipment’s complete proof load testing history whenever you need it for audit, insurance, or operational sign-off.

Equipment we can proof load test:

  • Overhead travelling cranes, jib cranes, and gantry cranes
  • Slings, shackles, chains, and lifting accessories
  • Lifting beams, spreader bars, and below-the-hook attachments
  • Forklift trucks, fork attachments, and lorry-mounted cranes
  • Bollard pull, brake render, and capstan testing for marine vessels
  • Calibrated weight, water bag, and hydraulic load application
  • New equipment commissioning and post-modification re-certification
Proof Load Testing

Need A Proof Load Test Scheduled?

Speak with our test engineers about your equipment, location, and timeframe.

Our Proof Load Testing Services

Testing Methods

There are several ways to apply a known load to lifting equipment, and we use all of them. We select a test method that best replicates the equipment’s in-service use, and which is the best fit for the equipment being tested, while keeping costs to a minimum for the customer.

Calibrated load cells and solid weights are the gold standard for accuracy. They’re traceable to UK national standards, verified annually, and they remove every variable from the test, making them most suitable for large, bulky and heavy equipment with easy access.

Horizontal and vertical test machines are used when precision matters, such as for small lifting accessories, accuracy-critical applications where the load needs to be applied gradually and lightweight items such as slings and strops.

Water bags are the preferred method for testing overhead cranes, gantries, jib cranes and any other items that you cannot reasonably bring to us. Fillable bags hang from the hook and are filled with water until the load is reached, and the equipment is held under load for the required period. The water bag method has been used for in-situ proof load testing for decades; it reduces high transportation costs. However, you do require a good water supply and an area to discharge the water. The load can be measured via a water flow meter or by putting a load cell between the hook and the load.

For heavyweight lifting equipment, hydraulics are often the most cost-effective and time-saving testing method. This is because hydraulic applications provide a controllable, repeatable force at capacities that no other method can sensibly deliver. This makes it suitable for very high load applications, applications where access is limited, and many other applications.

The right method is usually obvious once we know what the equipment is, where it lives, and the loads involved. There is always a solution when it comes to applying a load test.

Regulations & Standards

LOLER 1998 is the regulation most of our customers are working to. It requires that lifting equipment be thoroughly examined before first use, after substantial repair or modification, after any incident that may have damaged it, and at regular intervals throughout its life. Proof load testing forms part of that examination for new equipment, repaired equipment, and anything where there is reasonable doubt about capacity.

PUWER 1998 sits alongside LOLER and covers work equipment more broadly. Most lifting equipment falls under both, which means our testing has to satisfy both. It does.

For marine operators, the rules change. UK-flagged commercial vessels are governed by the Merchant Shipping and Fishing Vessels (Lifting Operations and Lifting Equipment) Regulations 2006, for which details can be found within MGN 332 (M+F) Amendment 4.

For Lifesaving appliances IMO Resolution MSC.402(96), establishes mandatory standards for the maintenance, thorough examination, operational testing, overhaul, and repair of lifeboats, rescue boats, launching appliances, and release gear. Alongside MSC.404(96) amendments to SOLAS Chapter III/20.11, these regulations ensure that all such servicing is conducted by personnel certified by an authorised service provider to enhance maritime safety. Some of our approvals as a service supplier include Lloyd’s Register, DNV, and RINA.

Defence work has its own protocols. Some of our customers operate at HM Naval Bases. Some hold contracts with the MOD. We hold the security clearances, the NATO Stock Number familiarity, and the procedural understanding that defence work needs.

If your equipment falls under a regulation we have not mentioned here, ask. There is a reasonable chance we are already working on it for someone else.

Industries We Serve

Most lifting equipment in the United Kingdom belongs to industries where failure has serious consequences. That is who we work with.

Marine is our largest and oldest sector. We test deck cranes, davits, gantries, mooring equipment, and lifesaving appliances on vessels operating from UK ports and well beyond. Our riding squad travels with the vessel when in-service testing is required, which means certification stays current without holding the ship in port. We worked on the Cunard Britannia naming ceremony rig. We support superyacht operations across the Mediterranean. The marine work that put SWL on the map continues to define what we do.

Defence customers, including the Royal Navy and MOD establishments, depend on us for rigging warrant surveys, proof load testing of specialist equipment, and engineering support at HM Naval Bases. Security clearance and procedural familiarity are not optional in this work, and we have both.

Aviation is a smaller but technically demanding part of what we do. Our most well-known aviation project was the 747-400 stress jacking programme, where proof load testing of the lifting points was non-negotiable. The same standards now apply across our ground support equipment work for major airline operators.

Construction, manufacturing, utilities, transportation, and waste recycling all rely on lifting equipment that has to be tested, certified, and recorded. We work with all of them.

LOLER Proof Load Testing

Certificates & Reporting

A proof load test that is not properly documented might as well not have happened. We have built our reporting around the assumption that you will need to produce a certificate at short notice, possibly to a regulator, an insurer, or an auditor who has never met you.

Every certificate we issue goes through our digital portal, CheckedOK. The platform stores the test record, the equipment identifier, the proof load applied, the method used, the calibration references for the test apparatus, the engineer’s signature, and the next-due date. Authorised users log in, find the asset, and download the certificate. That is the whole workflow.

If a defect is identified during testing, it is logged in the portal immediately. The status stays open until the issue is resolved, with notes from the engineer and any follow-up work attached to the record. This matters when you are being audited, and someone asks what happened to a defect that was flagged eighteen months ago. The answer is on the screen.

Our certification is accepted across regulated industries in the United Kingdom and internationally. ISO 9001 quality management. LEEA accreditation. Bureau Veritas approval, where it applies. The paperwork stands up to scrutiny.

Frequency & Compliance

LOLER sets out the minimum testing intervals, and operators tend to assume those minimums are the answer. They often are not.

Lifting equipment used for lifting people, and accessories for lifting, requires examination at least every six months. Other lifting equipment requires examination at least every twelve months. These are floors, not ceilings. If your equipment lives outside on a coastal site, runs three shifts a day, or operates in conditions the original manufacturer never imagined, your written scheme of examination should call for more frequent testing, not less.

New equipment requires proof load testing at commissioning, before it enters service. Modified equipment requires testing after the modification. Equipment involved in an incident, or equipment where the integrity is in any doubt, requires testing before it goes back into service. None of this is optional, and the consequences of operating uncertified equipment range from prosecution to insurer denial to people getting hurt.

Marine LOLER 2006 regulations lay out the requirement for testing on board all UK-registered vessels, plus non-UK vessels operating in UK waters. The regulation stipulates Annual Inspection and 5-yearly testing of all lifting equipment as standard, with additional requirements for equipment after modification or repair.  Further details can be found in MGN 332 (M+F) Amendment 4.

You can use the CheckedOK portal to track everything. We will also tell you what is due, when it is due, and how to get it done without disrupting your operations.

Nationwide Coverage

You don’t need to be near Southampton to use us. Our test engineers cover the whole United Kingdom, and we have been deploying to customer sites for long enough to know how to make a visit run smoothly wherever it lands.

On-site proof load testing is the right answer for most fixed equipment. Overhead cranes, gantries, jib cranes, structural beams, and anything bolted down or built in, we will bring the kit to you. Water bag rigs, hydraulic load cells, calibrated weights, the full test apparatus arrives on our vans, and the work is signed off before we leave site. Engineers travel from our Southampton base, with regional coverage built around routine customer schedules across the South Coast, Midlands, North West, North East, Scotland, and Wales.

In-house testing in our purpose-built test facility is the right answer for portable equipment. Slings, shackles, chains, lifting beams, spreader bars, and any accessory that can be shipped to us get tested faster, more accurately, and often at a lower cost than scheduling an on-site visit. Our in-house test bed can handle up to 100 tonnes, and calibration is traceable to UK national standards, and most accessories are returned within five to ten working days of receipt.

Our marine work travels the furthest. Our riding squad joins vessels in port across the United Kingdom and internationally, where in-service testing is required, with certification completed without holding the ship alongside.

Our Process

From Enquiry To Certificate

  1. 01

    Quote

    Tell us what needs testing, where it is, and your deadline. You'll have a quote within one working day covering the testing method, timing, and what we need from your side.

  2. 02

    Inspect

    Before any load is applied, our engineer inspects the equipment and the lifting points. If something isn't right, we will flag it before the test, not after.

  3. 03

    Test

    The proof load goes on using the method that suits the equipment (calibrated weights, water bag, or hydraulic). Our engineer will stay with it from first kilo to the last.

  4. 04

    Certify

    Your certificate lands in CheckedOK within 24 hours. This will include equipment history, next-due dates, and full records, all in one place and accessible from any device.

Why Choose SWL

Trusted By Industries That Can't Get It Wrong

Proven Across Every Sector

Marine, defence, aviation, construction, manufacturing, utilities and wherever lifting equipment has to be tested, certified, and trusted, we're already doing the work.

800-Tonne Capacity

Most testers cap out long before us. From a single shackle to an 800-tonne load, we have the kit and the engineers to do it.

LEEA, ISO 9001, Bureau Veritas

Our certificates stand up to audit, insurer scrutiny, and class society review as they are the accreditations regulated industries actually ask for.

CheckedOK Portal

Every certificate, every defect, every due date is all in one portal, accessible from any device. No paper chasing when the auditor turns up.

Our Proof Load Testing FAQs

Questions We Get Asked The Most

Can you proof load test our equipment on-site, or does it need to come to your facility?

Both. The right answer depends on the equipment, the load, and the practicality of moving it.

On-site testing is the usual choice for overhead cranes, gantries, jib cranes, and other fixed-in-place structural lifting equipment. We bring water bag rigs, hydraulic load cells, and calibrated weights to your facility, complete the test, and issue certification before we leave.

Our engineers cover the United Kingdom and can travel internationally for marine operations.

In-house testing in our workshops is the right call for smaller accessories, slings, shackles, lifting beams, and anything where the highest level of precision is needed (up to 800 tonnes). The test bed is environmentally controlled, the calibration is traceable, and the turnaround is typically quicker than scheduling an on-site visit.

We will recommend the appropriate approach when we quote. The decision is rarely close, but if it is, we will explain the trade-offs.

What load do you apply during a proof load test?

The proof load depends on the equipment type and the applicable standard. For most lifting equipment under LOLER, the proof load is 1.25 times the working load limit (WLL). For new chain slings and accessories, the WLL is typically twice. Bespoke or critical applications may require higher multiples, set by the manufacturer or the relevant standard.

The test load is applied gradually, held for the required period, and the equipment is inspected for permanent deformation, cracking, or any change in operating characteristics. If the equipment passes, we issue certification confirming the rated capacity. If it fails, the equipment is removed from service, and we document the findings.

We never test above the safe limit of the equipment, and we never test equipment that shows obvious signs of damage before the test begins. The point of proof load testing is to verify safe operation, not to find the failure point – that’s destructive testing, which is a separate service.

How quickly can you schedule a proof load test?

For most jobs, we can be on-site within one to two weeks of confirmation. Urgent work, such as equipment out of service, a vessel due to sail, or a project commissioning deadline, can usually be accommodated in a few days, sometimes sooner. We hold the diary capacity for it.

Marine work in port often runs to tighter timeframes, and we have engineers available for short-notice riding squad deployment so certification can be completed while the vessel is in service rather than holding it alongside.

In-house testing in our workshop typically turns around within five to ten working days from receipt of the equipment, faster for accessories that can go straight onto the test bed.

When you contact us, tell us what the equipment is, where it is, and when you need the certificate. We will give you a realistic date in the same call, not a holding response.

What if our equipment fails the proof load test?

A failure during proof load testing is far better than a failure in service. That is the entire point of the test.

When equipment fails, we document the mode of failure, which can be permanent deformation, cracking, weld degradation, brake slippage, hydraulic seal failure, whatever the case may be. The equipment is tagged out of service immediately, and the failure is logged with the engineer’s notes.

What happens next depends on the equipment and the failure. For repairable defects, we can often provide a repair quote. For terminal failures, the equipment can be decommissioned, and you receive documentation supporting the write-off for insurance or audit purposes.

We don’t charge extra for the failure documentation. It’s part of the job.

Are you accredited to carry out proof load testing for marine and defence work?

Yes. Our credentials and approvals reflect the markets we have worked in for decades.

For general lifting equipment work, we hold ISO 9001:2015 certification and full LEEA membership. Every engineer who carries out proof load testing on your equipment is LEEA-trained and qualified to issue a compliant certification.

For marine work, our marine division holds Bureau Veritas approval for Lifesaving Appliance testing. We are familiar with the requirements of Statutory Instrument 2186, Marine Guidance Note 332, IMO MSC.1/Circ.1206, and SOLAS Chapter III, and we work to the relevant class society requirements (Lloyd’s Register, DNV, Bureau Veritas, ABS) as the vessel demands.

For defence work, we hold the security clearances and procedural familiarity needed to operate at HM Naval Bases and on MOD contracts. NATO Stock Number requirements are routine for us.

If your work falls under a specific approval scheme we have not mentioned, ask. There is a reasonable chance we already hold it.