Ask most site managers for their LOLER certificates, and you’ll be handed a folder of paperwork from a mix of suppliers, examiners and hire companies. Some of it will be in date, and a surprising amount won’t meet the legal requirements for a report of thorough examination.
Every LOLER inspection we carry out ends with one of these reports, so we know exactly what should be on them and what gets missed.
This guide explains what a LOLER certificate is, what it must include, how long it lasts and how to tell whether the ones in your file would stand up. If you need the wider picture first, our guide to the LOLER regulations covers the law behind it.
What A LOLER Certificate Actually Is
“LOLER certificate” is the everyday name for a report of thorough examination. It’s the written record a competent person produces after examining a piece of lifting equipment, confirming whether it’s safe to keep using and setting out anything that needs to be put right.
The regulations don’t use the word certificate at all, and the difference matters.
A report isn’t a pass stamp that sits in a drawer. It’s a statement of the equipment’s condition on a given day, with a date by which it must be examined again.

What A LOLER Report Must Include
Schedule 1 of LOLER sets out what every thorough examination report must include. In practical terms, a compliant report records:
- The name and address of the employer and the premises where the examination took place
- Enough detail to identify the exact item, such as a serial or identification number
- The safe working load, or the safe working load for the configuration it was examined in
- The date of the examination and the date of the previous one
- Whether it was a six monthly, twelve monthly, scheme or exceptional circumstances examination
- Any defect found, the repair needed and the date by which it must be done
- Details of any test carried out as part of the examination
- The latest date for the next thorough examination
- The name, address and qualifications of the person who carried it out
The first examination after installation also needs a declaration that the equipment has been properly installed and is safe to operate. Once a report is issued, the competent person has 28 days to provide the written version to the duty holder.
How Long A LOLER Certificate Lasts
A report doesn’t expire in the way an MOT certificate does. It stays valid until the next examination date shown on it, which can be no later than six months away for accessories and equipment that lifts people, and twelve months for everything else, unless an examination scheme sets a different interval.
That date can come forward. For example, an overload, impact damage, a major repair, or moving a crane to a new location all trigger a fresh examination, regardless of what the last report says.
When A LOLER Report Lists A Defect
A defect on a report is an instruction, not a comment. If it poses an existing or imminent risk of serious injury, the equipment must be taken out of use straight away, and the competent person must also send a copy of the report to the HSE. Less serious defects carry a deadline for the repair.
However, the report alone doesn’t make the equipment compliant. A file full of in-date reports with open defects listed on them is evidence that problems were found and left, which is a far weaker position than most people assume. Where a repair needs proving before the equipment goes back into service, we carry that out through our proof load testing service.

Paper Or Digital LOLER Records
Reports don’t have to be on paper because the HSE accepts electronic records, provided they can be printed when required and are secure from alteration. That’s the reason every report we issue goes into CheckedOK, our online certificate portal, where each item carries its examination history, any open defects, and its next due date, so a lapsed examination is obvious long before it becomes a problem.
How To Check Your LOLER Certificates Are Up To Scratch
Pull a few reports from your file and look at them the way an inspector would. Each one should identify a single item clearly enough that you could walk out and find it. A line reading “various slings” doesn’t do that, and neither does a description with no serial number. The safe working load should be stated, the next examination date should be in the future, and any defect should have a matching record showing it was repaired.
You should also check that the accessories have their own reports. Slings, shackles and eyebolts need examining every six months, and they’re the items most likely to be missing when a crane’s own paperwork is perfectly in order. Where the equipment is a crane or hoist, our crane inspection and testing covers the machine and the accessories that work with it in the same visit.
LOLER Certificates & Training Certificates
A LOLER certificate for equipment is the report of thorough examination described above. A LOLER training certificate shows that a person has completed a course, and it has nothing to do with whether the equipment itself is safe.
The same goes for equipment covered by PUWER. Inspection records for work equipment are a separate requirement, and our PUWER inspections can run alongside a LOLER examination on the same visit.
Book Your LOLER Thorough Examination
If your file has gaps, out of date reports or defects nobody has closed off, our engineers can examine your lifting equipment on site or at our facility and get every report into CheckedOK so the records stay in order from here on. Contact our team to arrange an examination.


